Twenty men can pave a road in 18 days. To finish it in 12 days, the number of men required is
- 24
- 36
- 27
- 30
Show answer and solution
Correct answer: D. 30
The road needs 20 x 18 = 360 man-days, and 360/12 = 30 men.