Home › BBA Operations › Operations Management › Achieving World-Class Operations Management › Specifying and controlling the time required for…
Specifying and controlling the time required for each step in production is known as what?
ARouting of the production work
BPurchasing of the raw materials
CScheduling of the production work
DForecasting of the future demand
Answer & Solution
Correct answer: C. Scheduling of the production work
1. Scheduling is closely related to routing but answers a different question.
2. Routing asks where the work goes next, while scheduling asks when each step happens.
3. The operations manager prepares timetables showing the most efficient sequence and then ensures the necessary materials and labor are in the right place at the right time.
_Source: OpenStax Introduction to Business (CC BY 4.0), Ch 10 "Achieving World-Class Operations Management", section Scheduling: When Do We Do It?_
Related questions
What is business process management described as being able to do for a company?How have banks used automation to make services more accessible to customers?How do retail stores use point-of-sale terminals to improve operations?What does computer-integrated manufacturing combine?A flexible manufacturing system is expensive to install. Which combination of advantages jWhat does a flexible manufacturing system blend into an integrated system?For which kinds of task is replacing human effort with robots most effective?What is a robot in a production setting?