Which computerized system uses a master schedule to put materials, labor, and equipment in the right places, amounts, and times?
AElectronic data interchange between partners
BValue-stream mapping of the material flow
CA perpetual inventory of the major items
DMaterials requirement planning, or MRP
Answer & Solution
Correct answer: D. Materials requirement planning, or MRP
1. Materials requirement planning is a computerized system for controlling the flow of resources and inventory.
2. It works from a master schedule.
3. That schedule ensures the materials, labor, and equipment needed for production are at the right places, in the right amounts, and at the right times.
_Source: OpenStax Introduction to Business (CC BY 4.0), Ch 10 "Achieving World-Class Operations Management", section Computerized Resource Planning_
Related questions
What is business process management described as being able to do for a company?How have banks used automation to make services more accessible to customers?How do retail stores use point-of-sale terminals to improve operations?What does computer-integrated manufacturing combine?A flexible manufacturing system is expensive to install. Which combination of advantages jWhat does a flexible manufacturing system blend into an integrated system?For which kinds of task is replacing human effort with robots most effective?What is a robot in a production setting?