Which computerized system uses a master schedule to put materials, labor, and equipment in the right places, amounts, and times?

AElectronic data interchange between partners
BValue-stream mapping of the material flow
CA perpetual inventory of the major items
DMaterials requirement planning, or MRP
Answer & Solution
Correct answer: D. Materials requirement planning, or MRP
1. Materials requirement planning is a computerized system for controlling the flow of resources and inventory. 2. It works from a master schedule. 3. That schedule ensures the materials, labor, and equipment needed for production are at the right places, in the right amounts, and at the right times. _Source: OpenStax Introduction to Business (CC BY 4.0), Ch 10 "Achieving World-Class Operations Management", section Computerized Resource Planning_