Per Table 1.5, the maximum permitted FINAL setting time of Ordinary Portland Cement is:
A600 minutes
B180 minutes
C60 minutes
D1440 minutes
Answer & Solution
Correct answer: A. 600 minutes
1. Table 1.5 lists the maximum final setting time as 600 minutes for OPC (33, 43, 53 Grade), low heat, rapid hardening, Portland Pozzolana, Portland Slag, hydrophobic Portland and super sulphated cements.
2. The minimum initial setting time is 30 minutes (60 minutes for low heat and hydrophobic).
_Source: IGNOU ET-522 Block-1 Unit-1 Cement, Table 1.5, §1.9, p. 13_
Keep practising Cement
Browse all Cement questions for B.Tech Civil, or explore more Civil Engineering topics.
Related questions
Balance the Bogue calcium silicate hydration: tricalcium silicate plus water → C-S-H gel pType each cement-compound or admixture abbreviation as it appears.Pick the item that does not belong with the other three.Flip the cards and match each Bogue compound symbol to its full name.Per Table 1.5, the soundness of Ordinary Portland Cement tested by the Le Chatelier methodThe minimum specific surface (by Blaine air permeability) prescribed for Ordinary PortlandAir entraining cement is used principally to improve the resistance of concrete to:The cement most ideally suited for mass concrete construction such as dams, per the source