Two constant-rate workers finish together in 6 days. Alone, one takes 5 days longer. Faster worker alone?
A9 days
B10 days
C12 days
D15 days
Answer & Solution
Correct answer: B. 10 days
The equation 1/t+1/(t+5)=1/6 gives t²−7t−30=0 and the positive time t=10.
Keep practising Quadratic Equations
Browse all Quadratic Equations questions for ICSE Class 10, or explore more Mathematics topics.
Related questions
Match each relation between roots α, β of ax² + bx + c = 0 with its formula:Match each geometric word problem with its quadratic equation model:Match each quadratic equation with its roots:Match each quadratic discriminant D = b² - 4ac value with the nature of roots:₹1,000 becomes ₹1,210 after 2 years, compounded annually at a constant nonnegative rate. ATwo ages differ by 24 years; in 4 years their product is 432. Younger age now x. Equation?How many rectangles have perimeter 20 m and area 30 m²?A maker produces n toys, n<20. Each costs ₹(40−n); total cost ₹375. Find n.