What is the Annual Contracted Quantity (ACQ) for pre-2009 Thermal Power Plants under CIL FSAs?

A223.92 MT
B13.5 MT
C78.5 MT
D236.95 MT
Answer & Solution
Correct answer: A. 223.92 MT
For pre-2009 TPPs, the valid ACQ is 223.92 MT. For Post-NCDP power, the ACQ of valid FSAs is 236.95 MT. Apart from these, 23 CPSU units have linkages with an ACQ of about 13.5 MT, renewable on five-year basis under NRS policy. (Source: AR 2024-25 Ch 10 section 9.)