A job uses Rs 8,000 material and 40 hours at Rs 25. Overhead is Rs 150 per hour. Total cost?

ARs 9,000
BRs 14,000
CRs 15,000
DRs 16,000
Answer & Solution
Correct answer: C. Rs 15,000
Labour is 40 x 25 = 1,000 and overhead is 40 x 150 = 6,000, so 8,000 + 1,000 + 6,000 = 15,000.