A and B can do a piece of work in 24 days, B and C in 30 days, and C and A in 40 days. How long would all three together take to do the same work?
A10 days
B15 days
C20 days
D24 days
Answer & Solution
Correct answer: C. 20 days
Let A, B, and C do $x$, $y$, and $z$ work per day. Then $x+y=1/24$, $y+z=1/30$, and $x+z=1/40$. Adding gives $2(x+y+z)=1/24+1/30+1/40=1/10$. So $x+y+z=1/20$. Therefore all three together take 20 days.
Related questions
Which of the following is a linear equation in one variable?A number divided by 2 is 5 less than the number itself. What is the number?The sum of three consecutive integers is 24. What are the integers?For the pair of linear equations $3x+2y=12$ and $-x+y=3$, what does the graphical solutionUsing the graph of $3x+2y=12$ and $-x+y=3$, what is the solution of the system?
![](httpsSolve the system by elimination: $x+y=7$ and $3x+2y=10$.A system of two linear equations in two variables has infinitely many solutions when whichWhat is the discriminant of the quadratic equation $Ax^2+Bx+C=0$?